PUMP HOUSE DESIGN

Built:  2014

Location: Mount Jewett PA

Project Details:

  • Re-pour the deteriorated floor.
  • Install platform to provide level landing on each side of the entrance door.
  • Install ladder into vault area for personnel access and safety exit.
  • Install a rail system for the two grinder pumps to allow easy removal and maintenance.
  • Install electric hoist system for pump removal.
  • Re-roof pump building.
  • Install a natural gas powered generator and necessary equipment for emergency backup.
  • Install a new entrance door.
  • Install a new shut-off valve outside of the lift station.