PUMP HOUSE DESIGN
Built: 2014
Location: Mount Jewett PA
Project Details:
- Re-pour the deteriorated floor.
- Install platform to provide level landing on each side of the entrance door.
- Install ladder into vault area for personnel access and safety exit.
- Install a rail system for the two grinder pumps to allow easy removal and maintenance.
- Install electric hoist system for pump removal.
- Re-roof pump building.
- Install a natural gas powered generator and necessary equipment for emergency backup.
- Install a new entrance door.
- Install a new shut-off valve outside of the lift station.